Sectors > Corporate, Institutional & Industrial
Entask is very proud to be associated with several corporate,
institutional and industrial projects, though specific in requirements,
we work collaboratively with them to help them gain a sustainable
business. This means looking beyond, reducing risks and create
solutions that deliver competitive edge and commercial opportunity.
We go a step further than advising, we see things in perspective and
help clients take action and see results.
Projects
-
Airtel
Project by: Airtel, Bhubaneshwar.
Project Details: Built up area 0.4 million sqft (approx).
Status: Project completed.
-
UST Global
Project by: UST Global, Trivandrum.
Project Details: Built up area 0.75 million sqft (approx).
Status: Work in progress.
Certification: UST Global, Trivandrum. LEED GOLD certified green building.
-
Ramky Selenium - Corporate Office for Ramky
Project by: Ramky Infrastructure, Hyderabad.
Project details: Built up area is 0.5 million sqft (approx).
Status: Project completed in 2012.
Certification: LEED GOLD certified green building.
-
TCS Synergy Park - Phase 2
Project by: TCS and CMC, Hyderabad.
Project details: Built up area is 0.6 million sqft (approx).
Status: Phase 2 completed.
Certification: LEED GOLD certified green building.
-
TCS Synergy Park - Phase 3
Project by: TCS and CMC, Hyderabad.
Project details: Built up area is 0.35 million sqft (approx) and MLCP of 4 million sqft.
Built up area 1.5 million sqft (approx).
Status: Work is in progress.
Cerification: LEED GOLD certified green building.
-
Oracle
Project by: Oracle, Whitefield, Bangalore.
Project details: Built up area is 1.2 million sqft (approx).
Status: Projetc completed in 2012.
-
A O Smith
Project by: AO Smith, Geyser manufacturing unit at Jigani, Bangalore.
Project details: Built up area 0.35 million sqft (approx).
Status: Coming up in phases – Phase 1 is completed in 2010.
-
StarragHeckert
Project by: StarragHeckert, CNC machines manufacturing unit at Aerospace park near Devanahalli, Bangalore.
Project details: Built up area 0.2 million sqft (approx).
Status: Coming up in phases – Phase 1 completed in 2012.
-
Molex
Project by: Molex India Limited, data and voice structured cabling component manufacturing unit at Whitefield, Bangalore.
Project details: Built up area 0.2 million sqft (approx).
Status: Project completed in 2006